-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Growing Industry
In this issue of PCB007 Magazine, we talk with leading economic experts, advocacy specialists in Washington, D.C., and PCB company leadership to get a well-rounded picture of what’s happening in the industry today. Don’t miss it.
The Sustainability Issue
Sustainability is one of the most widely used terms in business today, especially for electronics and manufacturing but what does it mean to you? We explore the environmental, business, and economic impacts.
The Fabricator’s Guide to IPC APEX EXPO
This issue previews many of the important events taking place at this year's show and highlights some changes and opportunities. So, buckle up. We are counting down to IPC APEX EXPO 2024.
- Articles
Article Highlights
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Estimated reading time: 1 minute
Best Practices 101, Part 2
A few months ago, Best Practices 101, Part 1 (May, 2014) was rolled out, focusing on process analysis as the first step in this process. This issue will discuss another powerful tool at our disposal: Value stream mapping.
“But we already made a process flowchart--isn’t that good enough?”
In a word, no. Process flow diagrams are a great first step, but they don’t tell the entire story. Value stream maps add one critical ingredient that standard process flowcharts don’t have: Time. Process flowcharts, whether drawn by hand or electronically, do not capture this important element. They simply present a snapshot of the sequence of steps in the process. Time is essential to understanding how one operation affects another and where your resources are being spent.
Value Stream Mapping
A value stream map (VSM) takes the basic flowchart to the next level, kind of like a process flowchart on steroids. In addition to the basic action boxes with arrows showing the flow of work, a lot of other information is added, including material and information flow, operating parameters, process lead-times, inventory, a timeline depicting value-added time relative to non-value added time, and so on. Value stream mapping is the single most effective major process analysis step to identify the value stream, and conversely, the non-value waste in your processes. The value stream is the set of all of the specific actions and activities required from the beginning of a process to the end of a process. Imagine a long and winding deep blue stream flowing through cities, counties, and states. Next, visualize all the things that the river carries within it: water, fish, minerals, plants, and a thousand other elements that combine to form the stream. Processes are very much like a stream; they flow in a natural direction and carry materials and information within them from one point to another.
Read the full column here.
Editor's Note: This column originally appeared in the September 2014 issue of The PCB Magazine.
More Columns from The Right Approach
The Right Approach: I Hear the Train A Comin'The Right Approach: Culture Change is Key to a QMS
The Right Approach: Leadership 101—Be a Heretic, Not a Sheep
The Right Approach: Leadership 101—The Law of Legacy
The Right Approach: Leadership 101: The Law of Explosive Growth
The Right Approach: Leadership 101—The Law of Timing
The Right Approach: The Law of Sacrifice
The Right Approach: The Law of Priorities