Boeing’s 1st Core Stage for NASA’s Space Launch System Arrives at Kennedy Space Center
May 3, 2021 | BoeingEstimated reading time: 1 minute
A Boeing-built rocket core stage for NASA’s Space Launch System was unloaded from a barge at the agency’s Kennedy Space Center and moved to the Vehicle Assembly Building.
The 212-foot (65-meter) core stage will be stacked with a Boeing/United Launch Alliance Interim Cryogenic Upper Stage, two solid rocket boosters, a Launch Vehicle Stage Adapter and the Orion spacecraft. Teams will prepare the SLS to launch Orion on an uncrewed mission around the moon and back called Artemis I.
The first in a series of increasingly complex missions, Artemis I will test the Orion spacecraft and SLS rocket as an integrated system ahead of crewed flights to the moon for sustained exploration. SLS is the only rocket that can send Orion, astronauts and cargo to the moon in a single mission.
Boeing is the prime contractor to NASA for the SLS core and upper stages and avionics. The company is joining major elements for the Artemis II core stage now at NASA’s Michoud Assembly Facility in New Orleans, while manufacturing core stage elements for Artemis III. The company also is working on evolvable capabilities for the rocket system such as the Exploration Upper Stage, which is entering production at Michoud.
Suggested Items
Reducing Nitrogen Consumption in Convection Soldering with Rehm Thermal Systems' Patented Mechatronic Curtain
03/28/2024 | Rehm Thermal SystemsCurrent developments indicate a need for larger throughput heights due to the trend towards e-mobility, which in turn increases nitrogen consumption for process inertization. Rehm Thermal Systems responds to this issue with an innovative solution: the mechatronic curtain.
Intel Announces New Program for AI PC Software Developers and Hardware Vendors
03/27/2024 | Intel CorporationIntel Corporation announced the creation of two new artificial intelligence (AI) initiatives as part of the AI PC Acceleration Program: the AI PC Developer Program and the addition of independent hardware vendors to the program.
SEMI ESD Alliance 2024 CEO Executive Outlook to Explore the Evolving RISC-V Movement and Semiconductor Design Ecosystem
03/27/2024 | SEMIKey executives from leading semiconductor EDA and IP companies will gather to discuss the latest industry trends, challenges and opportunities Thursday, May 9, in Santa Clara, California at the annual CEO Executive Outlook, hosted by the Electronic System Design Alliance (ESD Alliance), a SEMI Technology Community, and Keysight Technologies. Registration opens soon.
CentraTEQ to Showcase Wide Range of Vibration & Environmental Test Systems at Battery Tech Expo 24
03/26/2024 | CentraTEQEnvironmental and vibration test specialists CentraTEQ are excited to be exhibiting at the upcoming Battery Tech Expo, scheduled to take place at Silverstone on April 25, 2024.
SEMI 3D & Systems Summit To Spotlight Trends In Hybrid Bonding, Chiplet Design And Environmental Sustainability
03/26/2024 | SEMILeading experts in 3D integration and systems for semiconductor manufacturing applications will gather at the annual SEMI 3D & Systems Summit, 12-14 June, 2024,