Supplier Selection Key to Assembly Reliability


Reading time ( words)

Defining terms is always a good point to start, and from a practical standpoint, reliability can be simply defined as performance to both the design intent for the expected life cycle of the product.

When asked to discuss supply chain strategy, EMS and OEMs often respond with something like, “Yes of course, we have a purchasing department.” Supply chain management has progressed far beyond the old school purchasing mentality to become a key component of the modern business organization. We are all just pieces in the supply chain puzzle that is responsible for getting the ultimate customer’s product to market.

The first step in developing an SCM program is to identify all purchased materials (and services) into two categories, standard and critical. Suppliers of critical materials are the ones that need to be controlled; you probably don’t want to spend too much time managing your supplier of stationary and paperclips. A raw PCB supplier is a perfect example of a critical material, both from a technology complexity standpoint as well as a risk level. It only takes one defective $25 printed circuit board to destroy $2,500 worth of perfectly good electronic components.

Qualification Criteria

Strategically, deciding how to qualify new suppliers is the most critical step in the process. Of course, there must be an overriding strategy governing supplier identification and selection, but that would be a whole other column. The underlying tool should be an audit/survey that measures the quality system, financial viability and technology. Audits are frequently based on ISO 9000, which would be preferable if ISO registration is another qualification criterion (which is highly recommended). There should be a re-audit frequency established and some provision for the supplier to provide demonstration of continued capability for the time period between audits. This could be in the form of quarterly Cpk reports, ISO surveillance audit summaries, etc.

What is found too often are that suppliers have been grandfathered onto an AVL because they have always supplied materials, and that no one has ever audited the facility. Or, the only existing control is a self-audit that the supplier completes with no verification (which is probably ok since we all know that no one ever embellishes on their capabilities when filling out one of these!).

Read the full article here.


Editor's Note: This article originally appeared in the January 2014 issue of SMT Magazine.

Share




Suggested Items

Sustainability in Logistics Discussion Continues

06/07/2023 | I-Connect007
Episode 5 of I-Connect007’s podcast, On the Line with… features an interview with Zac Elliot, Siemens technical marketing engineer, who discusses sustainability in logistics internal to the factory. Listeners will hear how ineffective logistics create wasted effort in the form of ineffective materials transfers, or increasing line down-time when materials are not flowing to the line properly.

CHT: Where Heat Dissipation’s on the Rise

04/12/2023 | Kelly Dack, I-Connect007
Guest editor Kelly Dack recently spoke with Phil McDermott of CHT. Phil gave Kelly a brief overview of the products designers, engineers, and manufacturers might need, particularly when it comes to thermal management.

The Need for Real-time Measurements on the Factory Floor

04/05/2023 | Barry Matties, I-Connect007
During SMTA Dallas Expo 2023, Barry Matties spoke with Morgan Miller, field application engineer at Insituware, about the need for real-time measurement capabilities, like the Vision MARK-1 device offers, which is powered by analytical sensors, machine learning, and cloud-based technology to bring materials control solutions right to the factory floor.



Copyright © 2023 I-Connect007 | IPC Publishing Group Inc. All rights reserved.